Sidewalks, driveways, stoops, retaining walls, footings, underpinning and foundation repair across the Bronx.
JBS Concrete Pros pours and repairs concrete and foundations in the Bronx: DOT sidewalk violations, driveways and stoops, retaining walls, footings and foundation walls for new builds, and foundation crack repair and underpinning built to an engineer's plans.
The Bronx is the hilliest borough. Grade changes from Riverdale and Kingsbridge down to Highbridge and Morrisania put a lot of load on retaining walls, stairs and foundations built into slopes, and when water can't drain the wall or foundation is what gives. Retaining walls here hold back yards, driveways and property lines, so they get real footings, drainage stone and weep holes, and an engineer's design when the height calls for it. Older apartment buildings and attached houses on the South and East Bronx also bring sidewalk, curb and foundation repair.
DOT permit, replace the defective flags to spec, then request the dismissal inspection.
Crack repair, underpinning, waterproofing and new footings, built to the engineer's design.
Poured and block walls with footings, drainage stone and weep holes.
Tear-out, base prep, forming and pour.
Footings, foundation walls and slabs on grade for builders and owners.
Roll-off containers so tear-out debris leaves the site.
We take concrete and foundation work as a subcontractor on new-building and addition jobs in the Bronx: footings, foundation walls, slabs on grade, sidewalks and curbs. Send the drawings and schedule and we will quote from them.
How a job worksFull the Bronx overview, including dumpsters and masonry: The Bronx service area page.
We look at the wall, the drainage behind it and what it is holding back. Small walls can often be rebuilt with a proper footing and drainage; taller walls, or walls supporting a building or a neighbor's lot, need an engineer's design and DOB permit before work starts.
Sidewalk repair in NYC usually needs a DOT sidewalk permit, which the contractor pulls before work starts. See our NYC sidewalk violation guide.
Yes. Structural work such as footings, foundation walls, underpinning and retaining walls is built to the engineer's stamped plans, with the DOB filings and inspections the job requires.
Yes. Send the drawings and schedule and we will quote footings, foundation walls, slabs on grade, sidewalks and curbs from them.
GET AN ESTIMATE
Free written estimates for concrete and foundation work. Call or send the form and we will set up a site visit.